Gotthard road tunnel
Gotthard Massif | Switzerland
The construction project
The Gotthard Road Tunnel, completed in 1980, is showing its age and requires extensive renovation. To maintain the important north-south transport connection through the Swiss Alps during the renovation work, the Federal Roads Office (FEDRO) is building a second tunnel tube, which is expected to be operational from 2030.
After the new tube is completed, the first (old) tunnel tube will be repaired. Both tubes will then be available for traffic from 2033. One of the prerequisites for the expansion was the relocation of the access to the escape and rescue tunnel.
Product-specific requirements for doors: